• Services
  • Facility
  • Gallery
  • Products
  • Hypermono Blog
  • About/Contact
  • Services
  • Facility
  • Gallery
  • Products
  • Hypermono Blog
  • About/Contact

Archives

Monthly Archive for: "February, 2011"
Home /
0
0
By Chris Cosentino
In engine, machining, Moto2, transmission, V4 600
Posted February 18, 2011

Finishing the Generator Cover

I managed to stay late and squeeze in some more machining to finish up the generator cover.  After ending the last post with the first setup finished I then machined a simple fixture plate [...]

READ MORE
0
0
By Chris Cosentino
In engine, machining, Moto2, transmission, V4 600
Posted February 17, 2011

Starting on the Generator Cover

Back to making chips!  This post is the first part of fabricating the generator side engine cover.  this is a 2 piece cover with a threaded inspection port to give access to the end of [...]

READ MORE
0
0
By Chris Cosentino
In engine, kolb, machining, Moto2, transmission, V4 600
Posted February 12, 2011

Kolb Comes Through

Many thanks to Scott Kolb of Kolb Machine for delivering 2 perfectly capped and smoothed cylinder heads.  Scott is a fabrication ace and it is him who I turn to when my ham-fisted hand work [...]

READ MORE
0
0
By Chris Cosentino
In Uncategorized
Posted February 10, 2011

Machining the Crankshaft Connecting Rod Journals

I was able to get some more time in on Peter’s mill and got the journal machining done on all 3 crankshafts. After the last step the cranks were turned but did not have the offset journals [...]

READ MORE
0
0
By Chris Cosentino
In Uncategorized
Posted February 7, 2011

And now for something completely different

After working on all these engine parts I got a bug to shift focus and to make some inroads on the pile of chassis parts that need to be made.  My first choice was to make the upright legs [...]

READ MORE
0
0
By Chris Cosentino
In Uncategorized
Posted February 2, 2011

Initial Assembly testing

After the rush of the holidays and new year I was able to get more time in on the engine.  I did some long block assembly tests to check fit of all the reciprocating parts. All the parts fit [...]

READ MORE
Cosentino Engineering

201-392-1400 | info@cosentinoengineering.com
812 Jersey Ave. 3rd Floor,
Jersey City, NJ 07310

Copyright All Rights Reserved © 2016
Contact Us

Want to start a project or need more information? Let’s connect.

Not readable? Change text.