• Services
  • Facility
  • Gallery
  • Products
  • Hypermono Blog
  • About/Contact
  • Services
  • Facility
  • Gallery
  • Products
  • Hypermono Blog
  • About/Contact

Archives

Monthly Archive for: "November, 2011"
Home /
0
0
By Chris Cosentino
In Uncategorized
Posted November 17, 2011

Finishing the steering stem

It was way back in July that I turned the blanks for various length steering stems.  The various lengths allow me to adjust the amount of dive that happens under braking. Here’s where [...]

READ MORE
0
0
By Chris Cosentino
In Uncategorized
Posted November 14, 2011

Front end assembly

Now that the spider machining is done I can bolt the legs on and hope the axle holes line up! As expected both legs fit properly and the axle is a nice smooth sliding fit through both legs.  [...]

READ MORE
0
0
By Chris Cosentino
In Uncategorized
Posted November 7, 2011

T-shirt design is in!!

After starting a donations post for the blog that you can see here I realized that we didn’t have any t-shirts available and didn’t think people would want a plain fruit of the loom. [...]

READ MORE
0
0
By Chris Cosentino
In Uncategorized
Posted November 7, 2011

Machining the front spider

With momentum still rolling along I started on machining the center spider for the front suspension.  This is a multifunctional part that holds the upright legs, defines the steering axis, [...]

READ MORE
Cosentino Engineering

201-392-1400 | info@cosentinoengineering.com
812 Jersey Ave. 3rd Floor,
Jersey City, NJ 07310

Copyright All Rights Reserved © 2016
Contact Us

Want to start a project or need more information? Let’s connect.

Not readable? Change text.